#18552 F102 Medium CTC×Electrical conf: high

F102+8026

AuthorOliver Marshall
AssigneeCalum Greenwell
Causing Co.TGW Limited
StatusOpen
Created LMS2026-06-30T00:00:00+00:00
Imported2026-06-30T15:32:35.355734+00:00

Problem

F102+8026 estop installed on the slab below the mezzanine.

Solution

Relocate onto the mezzanine walkway as per the SAL and 3D. The cable is long enough for this change. Inform commissioning when this is completed. See files for SAL, 3D etc. Then remove any unused containment and floor bolts.